Adams Pool Solutions Completes Public Pool Restoration Resurfacing on Two Historic Pools

PLEASANTON, CA – November 03, 2026 – PRESSADVANTAGE –

Adams Pool Solutions has resurfaced both pools at the Hayward Plunge, a 1936 indoor public pool in Memorial Park on Mission Boulevard in Hayward, California, for the Hayward Area Recreation and Park District. The company applied a Pebble Tec Commercial White Quartz finish to the main pool, which measures 109 feet by 58 feet 8 inches, and to the children’s pool, which measures 46 feet by 30 feet 5 inches and ranges from 1 foot to 2 feet 6 inches deep.

The Hayward Plunge is one of the oldest indoor public pools in the Bay Area. The district lists it as a historical building and as ADA accessible. In the fall of 2025 the Plunge closed for a $5 million renovation of the whole facility, with lap swim, lessons and aqua fitness moving to the Arroyo Swim Center on November 3, 2025. The district published a closure window of fall 2025 through fall 2026, with construction wrapping in October 2026. The district’s scope is broader than the resurfacing work, covering parking lot ADA access, electrical repairs, water pipe replacement, interior painting, and revisions to the diving boards and swim lanes.

Adams Pool Solutions pool deck waterproofing

The resurfacing began with shell preparation on an existing shell that was stained and carried a history of patch repairs. Adams Pool Solutions works with park districts, schools, cities and hospitality properties across the Bay Area, the Central Valley and Las Vegas. A video of the work, “Restoring History: The Hayward Plunge Commercial Pool Renovation,” can be found on Adams Pool Solutions on YouTube.

Maintaining a single consistent finish across a public pool of this size called for careful control, with the Pebble Tec Commercial White Quartz applied in 52 custom batches across both pools.

“Resurfacing a public pool that has carried patch repairs for decades means every batch has to match the one before it,” said Ray Langford, Chief Marketing Officer of Adams Pool Solutions. “Across 52 custom batches on two pools, the goal was one consistent commercial finish that the district and the swimmers who return to the Hayward Plunge can rely on for years.”

The project submittals went in on October 8, 2025, and the work was built to a written architect’s and structural engineer’s specification. A case study of the project, including a specification table, is published on adamspools.com. Updates on the company’s commercial projects are also shared through Adams Pool Solutions on LinkedIn.

The company’s public pool portfolio includes Monterey Sports Park, the College of Marin Miwok Aquatic Center and Pacific Union College.

“Public aquatic facilities carry a lot of history and a lot of daily use,” Langford said. “The team approached the Hayward Plunge resurfacing the way it approaches every commercial restoration, working to the specification and holding the finish consistent from the first batch to the last.”

Adams Pool Solutions, 3675 Old Santa Rita Road, Pleasanton, California 94588, (925) 828-3100, adamspools.com, has been finishing pools since 1953 and is based in Pleasanton, California. The company builds commercial swimming pools for hotels, municipalities and educational institutions, and renovates both residential and commercial pools across the Bay Area, the Central Valley and Las Vegas.

###

For more information about Adams Pool Solutions, contact the company here:

Adams Pool Solutions
Ray Langford
(925) 828-3100
info@adamspools.com
3675 Old Santa Rita Rd, Pleasanton, CA 94588